Domestic Installer SchemeFamily-run business since 2010
Full house rewiring
Start with the future use of every room
A full house rewire in St John’s Wood is easier to plan when the owner has a clear view of the finished home. PEP works through the room layouts, furniture and fixed equipment before specifying the installation. A bedroom that may become a study, a reorganised kitchen and a changed utility space can each affect the point schedule. We separate confirmed requirements from possible later ideas so the current work has a definite basis.
01
Join the room plans into one installation
The route between rooms and floors matters as much as the position of individual accessories. We review access, the consumer-unit arrangement and the parts of the building being opened during refurbishment. Where finishes or joinery are retained, the likely disturbance and reinstatement responsibilities need to be understood. The builder and electrical team can then work from the same sequence for first fix, closed surfaces and final connections.
02
Leave clear records of the completed rewire
The agreed programme includes installation, testing, circuit identification and the relevant completion documentation. We also discuss occupancy and supply interruptions before the work is scheduled. If any sections remain outside the rewire, they are described explicitly so the owner knows what has and has not been renewed. That clarity makes the handover useful both for everyday ownership and for later changes to the property.
Before we quote
Useful details for your enquiry
A little information about your home helps us prepare a focused project discussion.
Final room layouts with furniture and appliance positions
A list of confirmed future uses that affect the current design
Details of retained floors, joinery and other access constraints
Your questions
Planning the work
Can the rewire allow for a planned home office?
Yes. Confirm the intended room and requirements before the point schedule is finalised so they can be considered within the installation design.
When should the electrical layout be signed off?
The key decisions should be settled before first fix. We coordinate with the project team so subsequent surface closure and fitted furniture follow the agreed electrical plan.
Tell us about the property, the work you have in mind and your intended programme. We will help establish the next step and the information needed for a clear quotation.